If a reviewer is removed from a team, any accepted or assigned review
assignments are set to rejected if the request deadline has not passed,
or set to no-response when the request deadline has passed.
Per [16819], if this scenario happens, and there are no other active or
completed review assignments, the request is shown as an
unassigned review.
Commit ready for merge.
- Legacy-Id: 16850
Note: SVN reference [16819] has been migrated to Git commit fdb4c2a055
If a review assignment is rejected, withdrawn, marked no response, etc.,
and this leaves a review request without any assigned/accepted/completed
review assignments, return the request state to "requested", which means
it will be shown as an unassigned review in all interfaces.
Commit ready for merge.
- Legacy-Id: 16819
If enabled for a team, reminders will be sent every X days to reviewers
for review assignments they have not accepted or rejected.
Commit ready for merge.
- Legacy-Id: 16792
The interleaved_migrations_test currently fails due to the various
migrations that have been added for individual tickets/commits (unless
--permit-mixed-migrations is set). I think this is better fixed in a
later cleanup, as doing it now could cause confusion when merging
individual commits, and more migrations are likely to be added soon.
Commit ready for merge.
- Legacy-Id: 16705
A notification is sent to the team secretary and reviewer, if an
unavailability period lasting 30 days or more will end in 3 days.
Commit ready for merge.
- Legacy-Id: 16704
Added Closing Notes to history and about pages for groups. Fixes issue #2725.
- Legacy-Id: 16586
Note: SVN reference [16559] has been migrated to Git commit 93b4d6fcc4
primary keys from character strings to integers, and makes corresponding code
changes.
This was prompted by database limitations discovered when trying to make
DocAlias use a m2m document field; with 255 long strings as primary keys for
Document and DocAlias this violated the MySQL database limitations.
Changing the primary keys to integers should also improve efficiency.
Due to the data migrations which create the new integer primary keys and adds
corresponding integer foreign keys matching the previous string foreign keys
in all tables having foreign keys to Document and DocAlias, some of these
migrations take a long time. The total set of migrations are expected to have
a runtime on the order of 2 hours.
- Legacy-Id: 16237
Remove some clutter from I-D upload page. The information was mived to the Instructions tab, but a higligh to the Note Well and BCP 78 was added. Fixes#2057.
- Legacy-Id: 16151
Note: SVN reference [16144] has been migrated to Git commit 37851b9742
Moved old nomcom announcements to database and removed references to legacy website. Fixes#2686.
- Legacy-Id: 16123
Note: SVN reference [16108] has been migrated to Git commit 26ebb022e7